Saturday 21 April 2012

Day 375 on the greenhouse extension

We have nearly finished the greenhouse extension on our little plot, all we have to do is to tape the joints up and 1 section of the guttering then it's done. We trimmed the roof section down because it overlapped a little so we could fit some guttering, saying that the guttering I found was some pipe that was dumped outside which was some left over gas pipe.I cut the pipe in half so I could use it on both sides, while I was cutting it Keith was sorting some brackets out to fix it to the greenhouse. Once we fitted it through the brackets that Keith made it worked and we started to catch water,I think keith wanted a Blue Peters badge for the work he had done on the guttering.

No comments:

Post a Comment